Document Actions
Port of West Sacramento Powered 100% by Solar Energy
Environmental Leader
A newly installed 637-kilowatt solar power system will supply the Port of West Sacramento with 100 percent of its electricity needs. It will cut the port’s energy costs by more than $20,000 annually and eliminate more than 34 million pounds of carbon-dioxide emissions over 25 years.
The system consists of 3,536 solar panels covering 90,000 square feet on the rooftops of two rice warehouse buildings. With the 25-year power purchase agreement, it was installed at no cost to the port by Pacific Power Management (PPM).

